top of page
Off Highway Van Family Truckster

Get in! We're building you a dream camper van

With 16 different floor plans across all three different van chassis (Sprinter, Transit, and Promaster), we've got something for everyone. Scroll down below to check them all out or reach out to us to help guide you through the process and picking the best van conversion for you. 

16 Different van conversion floorplans to meet all of your adventure criteria.

Diamond
Off Highway Van High Plains Drifter Camper Van

2 - 3 people

Compact floorplan

Spacious floorplan

Shower

$$$

Platinum

3- 4 people

Compact floorplan

Spacious floorplan

Shower

$$

Off Highway Van Buffalo Bill Camper Van
Gold
Off Highway Van Sundance Kid Camper Van

1 - 2 people

Compact floorplan

Spacious floorplan

Shower

$

From first steps to fueling up.

Off Highway Van Features
Off Highway Van Contact

Jump on a call with us

  • We talk about what you need and approximate cost, select a van chassis for your van build, and build layout.

  • Check out our van inventory to see the different chassis options and potential camper van inventory.

Off Highway Van Build Slot

Secure a build slot

($1K Build Deposit refundable up to 45 days after initial build deposit is placed)

Off Highway Van Design

We start designing with you

You work with our engineering staff and a project manager 

  1. Design Meeting #1 -Kick Off Meeting

  2. Design Meeting #2 - Interior and Palette

    • Work with our interior design specialist to pick your colors, fabrics, and materials. Build your dream camper van interior. 

    • Secondary walk through of your build sheet. 

  3. Design Meeting #3 (optional) - Finalizing Build

    • Any additional features you want in your van build- we ensure they are incorporated. ​

Off Highway Van Build Slot

75 days from build slot we order materials

(50% of remaining build cost due)

Off Highway Van Builder

On the van build date, we get to work

Off Highway Van Delivery

6-8 weeks later you take delivery

(50% of remaining build cost due)

Process
bottom of page